Bay Networks 4000 Installation Guide Page 156

  • Download
  • Add to my manuals
  • Print
  • Page
    / 162
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 155
Remote Annex 4000 Hardware Installation Guide
Appendix C Port Upgrade Instructions
C-8
2 Secure the cover and cable retainers using ten screws
(see
Figure C-10).
Do not over-tighten these screws (beyond 10 in-
lbs. of torque).
Figure C-10. Securing the Cover
Power-up and Test
The following instructions describe the power-up and test sequence.
1 Reconnect all the cables, including:
The transceiver cable.
Existing cables for the serial devices.
The parallel printer cable.
The console terminal cable.
The power cord.
Page view 155

Comments to this Manuals

No comments